OmegaCube ERP
by OmegaCube Technologies
A web-based manufacturing ERP from Itasca, Illinois for small and midsize discrete manufacturers, especially metal fabricators and job shops: quoting, BOMs, MRP, finite scheduling, work orders, shop-floor dispatch, quality, lots and serials, and its own accounting, deployed in the cloud or on-premise.
Why it is classified this way
We call this a Manufacturing ERP product. A broad business system (accounting, sales, purchasing) with a substantial manufacturing or planning module attached.
It is not labeled Full MRP because we have not verified that it accepts dated demand, sales orders, a forecast, or a master production schedule; nets that demand against stock on hand and orders already incoming; and explodes requirements through at least one level of the bill of materials. That is a statement about the evidence we found, not a claim that the product is weak, see the capability table and the sources below.
The six Full MRP tests, and how OmegaCube ERP does on each (3 of 6)
- YesIt represents a bill of materials, recipe, or formula.Evidence: omegacube.com › Bill of materials bom(opens in a new tab)
- PartialIt accepts dated demand, sales orders, a forecast, or a master production schedule.Not established. Backed only by a limited source (a vendor video from before 2023, source code, an old blog post or a single marketing line), which can fill the table but cannot pass this test.
- PartialIt nets that demand against stock on hand and orders already incoming.Not established. Only partly shown: the evidence covers some of this but not all of it, so the test is not established.
- PartialIt explodes requirements through at least one level of the bill of materials.Not established. Only partly shown: the evidence covers some of this but not all of it, so the test is not established.The BOM page lists "Explode BOMs from high level to the lowest level", but as a BOM view; the MRP page does not describe exploding demand through levels during a planning run. omegacube.com › Bill of materials bom(opens in a new tab); Marketing page, read 2026(opens in a new tab)
- YesIt uses lead times or required dates.Evidence: Marketing page, read 2026(opens in a new tab); Marketing page, read 2026(opens in a new tab); omegacube.com › Inventory management(opens in a new tab)
- YesIt produces dated buy, make, transfer, release, or reschedule recommendations.Evidence: Marketing page, read 2026(opens in a new tab); omegacube.com › Suppliers and purchasing(opens in a new tab); omegacube.com › Work order management(opens in a new tab)
These rules are applied identically to every product and enforced at build time, a record cannot be published as Full MRP unless all six pass with a source attached. Read the methodology.
Best for
- Metal fabricators and discrete job shops that want MRP, scheduling, shop floor and accounting in one system
- Shops that need the choice of cloud or on-premise and may want to switch later
- Automotive and aerospace suppliers working to EDI releases and IATF or AS9100 quality rules
Not a fit when
- Buyers who want a published price. Everything is quoted
- Process manufacturers working from recipes and formulas, which the pages never mention
Pricing facts
What it costs to do manufacturing in this product.
No published price
This vendor does not publish pricing, so you cannot compare it against anything here without contacting them. We will not estimate a figure.
What moves the real bill
- No published price. You have to contact the vendor, which usually means a sales call.
Pricing detail
No price is published. The FAQ says: "The cost of OmegaCube ERP depends on various factors such as your organization size, number of users, cloud/on-premise deployment, number of modules required, industry-specific customisation, integration, implementation, support and training," and sends buyers to the sales team.
Checked on September 19, 2026. Source: omegacube.com(opens in a new tab). Prices change. Check before you buy.
Manufacturing capability
22 of 25 fields resolved. "Unknown" means we have not found first-party evidence. It is not a No.
Planning
Working out what to buy or make, and when.
| Capability | Finding | What we found |
|---|---|---|
| Accepts dated demandYou can tell it what is due and when, sales orders with dates, a forecast, or a production schedule. | Yes | Planning takes "EDI releases, sales orders, and stock orders", and capacity requirements use "forecasts, confirmed orders, and stock orders". Supply planning is "based on demand due dates". Marketing pages only.Reviewed October 9, 2026. Source: Marketing page, read 2026(opens in a new tab)Question this |
| Nets against stock on handIt subtracts what you already have before telling you to buy more. | Partial | The MRP page talks of ensuring "adequate raw materials" and says its EDI functionality can "compute and generate net requirements change". How on-hand stock enters the calculation is not described.Reviewed October 9, 2026. Source: Marketing page, read 2026(opens in a new tab)Question this |
| Counts incoming ordersIt knows about purchase orders and production orders already placed, so it does not tell you to order twice. | Partial | MRP offers "automatic pegging of supply when demand due dates change", with a user-defined hard pegging window, which implies existing supply is matched to demand. Open purchase orders are not named.Reviewed October 9, 2026. Source: Marketing page, read 2026(opens in a new tab)Question this |
| Uses lead timesIt works backwards from when you need something to when you must order or start it, using supplier and production lead times. | Yes | "Compute lead time calculation of due dates based on demand size and process times", and production schedules are driven "based on manufacturing lead times". Lead times are also set per item on the inventory side. Marketing pages only.Reviewed October 9, 2026. Source: Marketing page, read 2026(opens in a new tab); Marketing page, read 2026(opens in a new tab); omegacube.com › Inventory management(opens in a new tab)Question this |
| Produces dated buy/make suggestionsThe output is an actionable list with dates, order this much by this date, start this batch on this date. | Yes | MRP gives "automatic guidance on purchases to delay and/or expedite", purchase orders and blanket releases can be created "from MRP", and work orders can be auto-created from MRP. The format of the suggestions is not shown.Reviewed October 9, 2026. Source: Marketing page, read 2026(opens in a new tab); omegacube.com › Suppliers and purchasing(opens in a new tab); omegacube.com › Work order management(opens in a new tab)Question this |
| Capacity planningChecks whether your people and machines can do the work in the time available. | Yes | Capacity is defined by employees, machines, shifts, days and months, with "backward and forward scheduling algorithms", load analysis by work center, and machine downtime linked into capacity.Reviewed October 9, 2026. Source: Marketing page, read 2026(opens in a new tab)Question this |
Production
Recipes, bills of materials, and running the work.
| Capability | Finding | What we found |
|---|---|---|
| Bill of materialsA list of the parts and quantities needed to make one of something. | Yes | BOM management covers "products, parts, and subassemblies" with costs, templates and rules.Reviewed October 9, 2026. Source: omegacube.com › Bill of materials bom(opens in a new tab)Question this |
| Multi-level BOMSub-assemblies inside assemblies, a part that is itself made from other parts, nested as deep as you need. | Yes | "Generate a single or multi-level Bill of Materials", including phantom BOMs linked to options.Reviewed October 9, 2026. Source: omegacube.com › Bill of materials bom(opens in a new tab)Question this |
| Recipes & formulasBatch-style production by weight, volume, or percentage, including scaling a batch up or down. | Unknown | Not yet researched. We would need: documentation of recipe or formula records, ideally with batch scaling.Know the answer? |
| Work / manufacturing ordersA record authorising and tracking the making of a specific quantity. | Yes | Work orders are auto-created "from Sales Orders, MRP, Quality, repairs, and Kanban", covering regular, repair, rework and stock work orders.Reviewed October 9, 2026. Source: omegacube.com › Work order management(opens in a new tab)Question this |
| Routings & operationsThe ordered steps a product goes through, and which machine or station does each one. | Yes | Work orders carry routing instructions, tools, fixtures and inspections per step, with alternate routings.Reviewed October 9, 2026. Source: omegacube.com › Work order management(opens in a new tab)Question this |
| Shop-floor trackingOperators report progress, time, and completions as the work happens. | Yes | Electronic dispatch lists by department, operator clock-in from the dispatch list, material availability per work order and late-running alerts.Reviewed October 9, 2026. Source: omegacube.com › Shop floor management(opens in a new tab); Marketing page, read 2026(opens in a new tab)Question this |
| Quality controlsChecks, tests, holds, and non-conformance records tied to production or receiving. | Yes | Non-conformance records with dispositions, defect codes, inspection sheets, and scrap, repair and rework orders generated from the disposition. Targets TS/ISO 16949 and AS9100.Reviewed October 9, 2026. Source: omegacube.com › Quality management(opens in a new tab)Question this |
Inventory & traceability
Knowing what you hold and being able to trace it.
| Capability | Finding | What we found |
|---|---|---|
| Batch & lot traceabilityWhich incoming material lots went into which finished batch, and where those finished goods went. | Yes | Lot control shows "lot hierarchy and view raw material/sub-assembly information", attaches mill certificates and heat numbers, and is built to "track bad product batches for instant product recall".Reviewed October 9, 2026. Source: omegacube.com › Lot control management(opens in a new tab); omegacube.com › Inventory management(opens in a new tab)Question this |
| Expiry & shelf lifeBest-before dates on materials and finished goods, with warnings before they lapse. | Partial | Lot control can "track lot quantities for perishable goods, harmful products and commodities with expiration dates". Warnings before expiry are not described.Reviewed October 9, 2026. Source: omegacube.com › Lot control management(opens in a new tab)Question this |
| Serial numbersUnique identifiers on individual units, for warranty or field service. | Yes | "Track inventory by lots and serial numbers in an intuitive graphical interface."Reviewed October 9, 2026. Source: omegacube.com › Inventory management(opens in a new tab)Question this |
Commerce & accounting
Costs, purchasing, storefronts, and the books.
| Capability | Finding | What we found |
|---|---|---|
| Product costing & COGSWhat it costs you to make one, and the cost of the goods you sold. | Yes | Inventory valuation by standard, actual or FIFO cost, and an Actual Costing module tracking materials, labour and overheads per finished good.Reviewed October 9, 2026. Source: omegacube.com › Inventory management(opens in a new tab); omegacube.com › Actual costing(opens in a new tab)Question this |
| PurchasingRaising and tracking purchase orders to suppliers from inside the system. | Yes | Purchase orders including blankets and outside-assembly purchases, created from MRP, with approvals and three-way matching.Reviewed October 9, 2026. Source: omegacube.com › Suppliers and purchasing(opens in a new tab); omegacube.com › Accounting(opens in a new tab)Question this |
| Accounting connectionSends financial data to bookkeeping software, or includes its own general ledger. | Yes | Accounts payable, accounts receivable and general ledger are part of the ERP.Reviewed October 9, 2026. Source: omegacube.com › Accounting(opens in a new tab)Question this |
| Ecommerce connectionPulls orders and pushes stock levels to a storefront or marketplace. | Yes | Integrations with "Shopify, Amazon, and Magento" push inventory and order status and pull orders.Reviewed October 9, 2026. Source: omegacube.com › E commerce integration(opens in a new tab); omegacube.com › Api based integration(opens in a new tab)Question this |
Openness & your data
Getting data in, out, and away if you leave.
| Capability | Finding | What we found |
|---|---|---|
| APIA documented programming interface so other software can read and write your data. | Partial | The vendor says it has "extensively used the Application Programming Interface (API) to connect OmegaCube ERP with various third-party applications for our customers". No public API reference was found.Reviewed October 9, 2026. Source: omegacube.com › Api based integration(opens in a new tab)Question this |
| WebhooksThe system can notify other software the moment something changes. | Partial | The e-commerce page mentions adding stores "using webhooks, API and other integration technologies". No documentation.Reviewed October 9, 2026. Source: omegacube.com › E commerce integration(opens in a new tab)Question this |
| MCP supportA Model Context Protocol server, letting an AI assistant read or act on this data. Useful, but it has nothing to do with whether the product plans materials. | Unknown | Not yet researched. We would need: a first-party mcp server, or documentation of one.Know the answer? |
| CSV exportYou can get your lists out as spreadsheet files. | Partial | The ERP is "integrated with MS Office tools such as MS Word and MS Excel". A CSV export is not described.Reviewed October 9, 2026. Source: omegacube.com › Integration(opens in a new tab)Question this |
| Full data exportYou can take everything, including history and relationships, not just a few screens' worth of rows. | Unknown | Not yet researched. We would need: documentation of a complete account export, database dump, or equivalent.Know the answer? |
Deployment, licensing and your data
- Deployment
- Cloud (hosted for you), On-premise (vendor-supported)
- Licensing
- Proprietary SaaS
- Team sizes
- 6–20 people, 21–50 people, 51+ people
- Manufacturing styles
- Custom or job-shop work, Countable assembled products
Integrations
- Shopify
- Amazon
- Magento
- UPS
- FedEx
- USPS
- EDI
- CAD
- Nesting software
- Machine monitoring
Jobs this product qualifies for
Derived from the capability table above, not hand-assigned.
Editorial notes and cautions
Things we would want a friend to know before buying.
- All the evidence is the vendor's own marketing pages. There is no public manual, so how MRP actually nets stock and open orders is unconfirmed.
- The FAQ lists implementation, integration and customization among the factors that set the price, so budget for services on top of licenses.
Evidence and verification
Why this record is not Verified. Held at partially verified because the evidence is marketing pages only and no price is published.
Researched 2026-09-19 from the vendor's home, FAQ and Why OmegaCube pages and its module pages, read in full (FAQ answers read from the page HTML). Held at partially verified because the evidence is marketing pages only and no price is published. The MRP and planning pages are registered as limited marketing sources, so their Yes values cannot pass the Full MRP tests.
Sources we checked (17)
omegacube.com
- Home page(opens in a new tab)
- Marketing page, read 2026(opens in a new tab)
- Marketing page, read 2026(opens in a new tab)
- Bill of materials bom(opens in a new tab)
- Work order management(opens in a new tab)
- Shop floor management(opens in a new tab)
- Quality management(opens in a new tab)
- Inventory management(opens in a new tab)
- Lot control management(opens in a new tab)
- Suppliers and purchasing(opens in a new tab)
- Accounting(opens in a new tab)
- Actual costing(opens in a new tab)
- Api based integration(opens in a new tab)
- Integration(opens in a new tab)
- E commerce integration(opens in a new tab)
- Faqs(opens in a new tab)
- Why omegacube(opens in a new tab)
What we still want to confirm
We publish our gaps rather than hiding them. If you can point us at a first-party page for any of these, we will update the record and credit the correction.
- Find documentation of the MRP run: whether it nets on-hand stock and open purchase and work orders, and what its suggestions look like.
- Confirm whether multi-level BOMs are exploded during MRP, not just displayed.
- Get an indicative price or license structure.
- Confirm API documentation, data export and whether there are native accounting connectors.
Still unknown: recipes & formulas, mcp support, full data export.